日韩视频在线播放-亚洲青涩-一级片日本-又色又爽又黄gif动态图-日韩视频二区-天天拍天天射-久久精品久久久久久久-日韩av一卡二卡-激烈娇喘叫1v1高h糙汉-蜜桃色av-天天狠狠操-国产五月-久久一线-久久久水蜜桃-性猛交xxxx

Share

Towngas Energy - Dongxin Paper Mill Distributed Energy Station Project

2023-02-06

Project Background

The power energy station is equipped with a 2MW gas internal combustion engine coupled with a flue gas/hot water-driven lithium bromide absorption chiller and other auxiliary equipment. All generated electricity is fed into the grid, while any shortfall in cooling capacity from the absorption chiller is supplemented by electric refrigeration units. The system achieves an annual comprehensive energy utilization rate of >85%.

Project Location:

Xinmi, Henan

Equipment Provided:

1*CG170-20/2000KW/10.5KV

Commissioning & Service:

Commissioned in late 2020 / Self-consumption with surplus electricity fed into the grid

Click the button on the right
Fill in product intention
Construction Machinery
400-881-8829
Engines/Generator Sets
400-821-3319
Lei Shing Hong Machinery Service APP
Lei Shing Hong Machinery Mini Program
Lei Shing Hong Machinery Service Platform Official Account
Lei Shing Hong Energy & Industrial Systems Official Account